+

poster of Tommy Walsh's Eco House
Rating: 0/10 by 0 users

Installing Rainwater-Harvesting Drainage System

The team installs the rainwater-harvesting drainage system, which supplies the toilets, washing machine and dishwasher.

Release Date: Wed, Oct 03, 2007

Country: GB
Language:
Runtime:
Subtitle     Direct Link

Season 1:

Introduction
Episode 1: Introduction (Oct 03, 2007)
The DIY guru attempts to build an affordable eco-friendly home in 60 days with a limited budget.
Installing Rainwater-Harvesting Drainage System
Episode 2: Installing Rainwater-Harvesting Drainage System (Oct 10, 2007)
The team installs the rainwater-harvesting drainage system, which supplies the toilets, washing machine and dishwasher.
Block-And-Beam Floor Delay
Episode 3: Block-And-Beam Floor Delay (Oct 17, 2007)
With the block-and-beam floor nowhere to be seen, the team tries to come up with a solution to allow the bricklayers to begin their work.
Damp-Proof Membrane & Thermal Blocks
Episode 4: Damp-Proof Membrane & Thermal Blocks (Oct 24, 2007)
To improve the house's energy efficiency, a damp-proof membrane is laid to prevent heat loss and thermal blocks are used instead of concrete increasing, the house's thermal efficiency.
First-Floor Joists & Timber Frame Roof
Episode 5: First-Floor Joists & Timber Frame Roof (Oct 31, 2007)
The joists for the first floor are installed along with the timber frame that forms the basis of the roof. And the team try to eat doughnuts without licking their lips.
Polyurethane Wall Insulation
Episode 6: Polyurethane Wall Insulation (Nov 07, 2007)
Polyurethane wall insulation is added, and the team considers installing supportive wooden pegs called 'nogs'.
Roof Slates & Solar Panels
Episode 7: Roof Slates & Solar Panels (Nov 14, 2007)
The roof slates and solar panels are fitted to the house, and the team learns the property will be the most energy-efficient in the Fens.
Exterior Cladding & Under-Floor Heating
Episode 8: Exterior Cladding & Under-Floor Heating (Nov 21, 2007)
The house starts to take shape as the exterior cladding is fitted and the under-floor heating is installed.
Rooms Boarded & Special Water Tank
Episode 9: Rooms Boarded & Special Water Tank (Nov 28, 2007)
The rooms are boarded in preparation for plastering, and a special water tank becomes the latest environmentally friendly addition to the project.
Completing The Project
Episode 10: Completing The Project (Dec 05, 2007)
With the deadline looming, there's still a lot to do. Tommy and the team work on the fitting the staircase, tiling, electrics and plumbing in a bid to complete the project.


My Favorite

Welcome back!

Support Us

Like Movienade?

Please buy us a coffee

scan qr code